Published: 25 July 2022

  • Client - Mickleover FC
  • Value - £725,000
  • Date - June 2021

Conversion of the existing natural turf pitch to a premier league standard artificial pitch

Our client wished to convert their existing pitch to a high class 3g pitch as well as improving the whole facility. The pitch was moved approx 20m to the west and required full reconstruction of the surrounds, installation of new floodlights & new spectator fencing to the perimeter. In addition we also installed 8m high ballstop fencing to both the Radbourne Lane boundary and the cricket pitch boundary. In an effort to future proof the pitch we installed full perimeter ducting, an irrigation system and tank, surface water drains and finally concrete bases for the new stands. 

 